JNTU Kakinada B-Tech 4-2 PRODUCTION PLANNING AND CONTROL R13 April 2018 Question Paper

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Define production planning and control. [3]
b) Write the types of forecasting. [4]
c) What are the limitations of JIT? [4]
d) Define scheduling. [3]
e) Write about expediting. [4]
f) Write the various activities of dispatcher. [4]
PART?B (3×16 = 48 Marks)
2. a) Explain various elements of Production Control. [8]
b) List out the planning functions and controlling functions separately, explain
them briefly.
[8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.7.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[8]
b) A comparison of monthly sales of expensive item, against the total number of
visits made by a salesman during the previous month, yields the following data.
Is the correlation of the two variables good enough to enable the number of
visits, to be adopted as an efficient indicator of future sales?
Sales 1 3 5 7 11
Visits 2 4 8 9 10

[8]

4. a) What are the advantages of inventory control? What are the symptoms of poor
inventory control
[8]
b) Explain the scope of ERP and difficulties in implementation. [8]

5. a) Distinguish between loading and scheduling. [8]
b) Describe different operation sheets and explain how routing procedure can be
prepared from them.
[8]

6. a) Explain the standard scheduling methods in detail. [8]
b) What is the purpose of aggregate planning? Explain in detail. [8]

7. a) Describe dispatching control in intermittent production and continuous
production.
[8]
b) Explain the role of computers in carrying various functions of PPC. [8]

Code No: RT42031
Set No. 1
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Define production planning and control. [3]
b) Write the types of forecasting. [4]
c) What are the limitations of JIT? [4]
d) Define scheduling. [3]
e) Write about expediting. [4]
f) Write the various activities of dispatcher. [4]
PART?B (3×16 = 48 Marks)
2. a) Explain various elements of Production Control. [8]
b) List out the planning functions and controlling functions separately, explain
them briefly.
[8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.7.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[8]
b) A comparison of monthly sales of expensive item, against the total number of
visits made by a salesman during the previous month, yields the following data.
Is the correlation of the two variables good enough to enable the number of
visits, to be adopted as an efficient indicator of future sales?
Sales 1 3 5 7 11
Visits 2 4 8 9 10

[8]

4. a) What are the advantages of inventory control? What are the symptoms of poor
inventory control
[8]
b) Explain the scope of ERP and difficulties in implementation. [8]

5. a) Distinguish between loading and scheduling. [8]
b) Describe different operation sheets and explain how routing procedure can be
prepared from them.
[8]

6. a) Explain the standard scheduling methods in detail. [8]
b) What is the purpose of aggregate planning? Explain in detail. [8]

7. a) Describe dispatching control in intermittent production and continuous
production.
[8]
b) Explain the role of computers in carrying various functions of PPC. [8]

Code No: RT42031
Set No. 1
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Write the scope of production planning and control. [4]
b) Define forecasting. [3]
c) What are the benefits of JIT? [4]
d) Write the applications of routing. [4]
e) Enumerate the main purpose of scheduling in brief. [4]
f) Define the term follow up. [3]

PART?B (3×16 = 48 Marks)
2. a) Describe the different types of production systems. [8]
b) Explain about functions of production systems. [8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.3.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[10]
b) Explain the general principles of forecasting techniques. [6]

4. a) Explain various costs associated with inventory. [8]
b) Explain the inputs and outputs of the MRP system. [8]

5. a) Explain the concept of Bill of materials in detail. [8]
b) Explain the general procedure involved in preparing route sheet. [8]

6. a) Compare and contrast different scheduling policies. [8]
b) Explain the various controlling aspects of production in detail. [8]

7. a) Write the applications of computer in production planning and control. [8]
b) What are typical advantages and disadvantages of dispatching with
decentralized control?
[8]

Code No: RT42031
Set No. 2
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Define production planning and control. [3]
b) Write the types of forecasting. [4]
c) What are the limitations of JIT? [4]
d) Define scheduling. [3]
e) Write about expediting. [4]
f) Write the various activities of dispatcher. [4]
PART?B (3×16 = 48 Marks)
2. a) Explain various elements of Production Control. [8]
b) List out the planning functions and controlling functions separately, explain
them briefly.
[8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.7.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[8]
b) A comparison of monthly sales of expensive item, against the total number of
visits made by a salesman during the previous month, yields the following data.
Is the correlation of the two variables good enough to enable the number of
visits, to be adopted as an efficient indicator of future sales?
Sales 1 3 5 7 11
Visits 2 4 8 9 10

[8]

4. a) What are the advantages of inventory control? What are the symptoms of poor
inventory control
[8]
b) Explain the scope of ERP and difficulties in implementation. [8]

5. a) Distinguish between loading and scheduling. [8]
b) Describe different operation sheets and explain how routing procedure can be
prepared from them.
[8]

6. a) Explain the standard scheduling methods in detail. [8]
b) What is the purpose of aggregate planning? Explain in detail. [8]

7. a) Describe dispatching control in intermittent production and continuous
production.
[8]
b) Explain the role of computers in carrying various functions of PPC. [8]

Code No: RT42031
Set No. 1
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Write the scope of production planning and control. [4]
b) Define forecasting. [3]
c) What are the benefits of JIT? [4]
d) Write the applications of routing. [4]
e) Enumerate the main purpose of scheduling in brief. [4]
f) Define the term follow up. [3]

PART?B (3×16 = 48 Marks)
2. a) Describe the different types of production systems. [8]
b) Explain about functions of production systems. [8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.3.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[10]
b) Explain the general principles of forecasting techniques. [6]

4. a) Explain various costs associated with inventory. [8]
b) Explain the inputs and outputs of the MRP system. [8]

5. a) Explain the concept of Bill of materials in detail. [8]
b) Explain the general procedure involved in preparing route sheet. [8]

6. a) Compare and contrast different scheduling policies. [8]
b) Explain the various controlling aspects of production in detail. [8]

7. a) Write the applications of computer in production planning and control. [8]
b) What are typical advantages and disadvantages of dispatching with
decentralized control?
[8]

Code No: RT42031
Set No. 2
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Write the applications and examples for mass production. [4]
b) Write the uses of forecasting. [4]
c) Write about MRP-II. [4]
d) Define routing. [3]
e) Why scheduling is essential? [4]
f) Write the importance of dispatching on time. [3]

PART?B (3×16 = 48 Marks)
2. a) What are the activities in control phase of PPC? Explain in brief. [8]
b) What are the objectives for which PPC department is established in a factory
system?
[8]

3. a) Find the MAD (Mean Absolute Deviation) and MSE (Mean Square Error) for the
following forecast.
Period 1 2 3 4 5 6 7 8 9 10 11 12
Actual
Demand
97 93 110 98 130 133 129 138 136 124 139 125
Forecasted
Demand
100 100 100 100 102 104 106 108 110 112 114 116

[8]
b) Difference between qualitative and quantitative methods. [8]

4. a) Explain the various functions of inventory management. [8]
b) Explain P and Q systems of controlling the inventories with neat diagrams. [8]

5. a) What are the important factors that affecting routing procedure. [8]
b) Define route sheet? What is the information it contains? Explain it by drawing a
route sheet.
[8]

6. a) Explain about the scheduling techniques in detail. [8]
b) Explain the concept of Line Balancing in detail. [8]

7. a)What is material follow up? What is the role of purchase department in material
follow up.
[8]
b) Explain advantages & disadvantages of dispatching ? centralized control. [8]

Code No: RT42031
Set No. 3
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Define production planning and control. [3]
b) Write the types of forecasting. [4]
c) What are the limitations of JIT? [4]
d) Define scheduling. [3]
e) Write about expediting. [4]
f) Write the various activities of dispatcher. [4]
PART?B (3×16 = 48 Marks)
2. a) Explain various elements of Production Control. [8]
b) List out the planning functions and controlling functions separately, explain
them briefly.
[8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.7.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[8]
b) A comparison of monthly sales of expensive item, against the total number of
visits made by a salesman during the previous month, yields the following data.
Is the correlation of the two variables good enough to enable the number of
visits, to be adopted as an efficient indicator of future sales?
Sales 1 3 5 7 11
Visits 2 4 8 9 10

[8]

4. a) What are the advantages of inventory control? What are the symptoms of poor
inventory control
[8]
b) Explain the scope of ERP and difficulties in implementation. [8]

5. a) Distinguish between loading and scheduling. [8]
b) Describe different operation sheets and explain how routing procedure can be
prepared from them.
[8]

6. a) Explain the standard scheduling methods in detail. [8]
b) What is the purpose of aggregate planning? Explain in detail. [8]

7. a) Describe dispatching control in intermittent production and continuous
production.
[8]
b) Explain the role of computers in carrying various functions of PPC. [8]

Code No: RT42031
Set No. 1
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Write the scope of production planning and control. [4]
b) Define forecasting. [3]
c) What are the benefits of JIT? [4]
d) Write the applications of routing. [4]
e) Enumerate the main purpose of scheduling in brief. [4]
f) Define the term follow up. [3]

PART?B (3×16 = 48 Marks)
2. a) Describe the different types of production systems. [8]
b) Explain about functions of production systems. [8]

3. a) Using the exponential smoothing technique, Compute the forecasts from the
following data (time series) under the situations when a = 0.3.Compute the
forecast for the 11
th
period?

Month 1 2 3 4 5 6 7 8 9 10
Demand 28 30 32 31 27 26 30 33 32 31

[10]
b) Explain the general principles of forecasting techniques. [6]

4. a) Explain various costs associated with inventory. [8]
b) Explain the inputs and outputs of the MRP system. [8]

5. a) Explain the concept of Bill of materials in detail. [8]
b) Explain the general procedure involved in preparing route sheet. [8]

6. a) Compare and contrast different scheduling policies. [8]
b) Explain the various controlling aspects of production in detail. [8]

7. a) Write the applications of computer in production planning and control. [8]
b) What are typical advantages and disadvantages of dispatching with
decentralized control?
[8]

Code No: RT42031
Set No. 2
R13
1 of 1

IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Write the applications and examples for mass production. [4]
b) Write the uses of forecasting. [4]
c) Write about MRP-II. [4]
d) Define routing. [3]
e) Why scheduling is essential? [4]
f) Write the importance of dispatching on time. [3]

PART?B (3×16 = 48 Marks)
2. a) What are the activities in control phase of PPC? Explain in brief. [8]
b) What are the objectives for which PPC department is established in a factory
system?
[8]

3. a) Find the MAD (Mean Absolute Deviation) and MSE (Mean Square Error) for the
following forecast.
Period 1 2 3 4 5 6 7 8 9 10 11 12
Actual
Demand
97 93 110 98 130 133 129 138 136 124 139 125
Forecasted
Demand
100 100 100 100 102 104 106 108 110 112 114 116

[8]
b) Difference between qualitative and quantitative methods. [8]

4. a) Explain the various functions of inventory management. [8]
b) Explain P and Q systems of controlling the inventories with neat diagrams. [8]

5. a) What are the important factors that affecting routing procedure. [8]
b) Define route sheet? What is the information it contains? Explain it by drawing a
route sheet.
[8]

6. a) Explain about the scheduling techniques in detail. [8]
b) Explain the concept of Line Balancing in detail. [8]

7. a)What is material follow up? What is the role of purchase department in material
follow up.
[8]
b) Explain advantages & disadvantages of dispatching ? centralized control. [8]

Code No: RT42031
Set No. 3
R13
1 of 1
IV B.Tech II Semester Regular/Supplementary Examinations, April – 2018
PRODUCTION PLANNING AND CONTROL (Common to Mechanical Engineering and Mining Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART?A (22 Marks)
1. a) Write the applications and examples for batch shop production. [4]
b) Write the importance of forecasting. [3]
c) Write about MRP-I. [4]
d) Write the applications of scheduling. [4]
e) Mention the significance of expediting for production planning. [4]
f) Define dispatching. [3]

PART?B (3×16 = 48 Marks)
2. a) With the help of an organization chart explain how PPC department can carry out
its functions.
[8]
b) Explain the importance of PPC department in a typical production system. [8]

3. a) Fit the linear regression model for the following data and forecast the demand for
the period 9.
Period 1 2 3 4 5 6 7 8
Demand 750 820 840 820 840 755 785 750

[8]
b) For the given data, compute 3 month moving average
Month Jan Feb Mar Apr May June July Aug Sep Oct
Orders 120 90 100 l 75 110 50 75 130 110 90
Compute the 3 month weighted moving average with a weight of 52% for the
October data, a weight of 23% for the September data, and a weight of 18% for
the August data.

[8]

4. a) An electric housing has an annual usage rate of 75,000 units/year, an ordering
cost Rs, 800 and annual carrying charge of 15.4% of the unit price. Delivery lead
time is 2 weeks. Determine EOQ, Lead time consumption and the optimal
operating doctrine. (Assuming the cost of one unit is Rs. 12).

[8]
b) Explain the various steps of Line of Balance technique. [8]

5. a) Explain about the Routing procedure. [8]
b) What is the role of bills of materials? How demand affects the bill of material? [8]

6. a) Explain the various types of graphs used in scheduling and control related
problems.
[8]
b) Explain about the concept of Chase planning. [8]

7. a) Explain how tool dispatching works in centralized control and decentralized
control.
[8]
b) Explain the significance of follow up in production. [8]
Code No: RT42031
Set No. 4
R13
1 of 1

Team FirstRanker.in

Share
Published by
Team FirstRanker.in

Recent Posts

MGR University BPT Fourth Year 746268 PAPER V – REHABILITATION MEDICINE INCLUDING GERIATRIC MEDICINE August 2018 Question Paper

746268 PAPER V - REHABILITATION MEDICINE INCLUDING GERIATRIC MEDICINETHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY…

4 years ago

MGR University BPT Fourth Year 746268 PAPER V – REHABILITATION MEDICINE INCLUDING GERIATRIC MEDICINE August 2018 Question Paper

746268 PAPER V - REHABILITATION MEDICINE INCLUDING GERIATRIC MEDICINETHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY…

4 years ago

MGR University BPT Fourth Year 746267 PAPER IV – P.T. IN ORTHOPAEDICS August 2018 Question Paper

746267 PAPER IV - P.T. IN ORTHOPAEDICSTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6267]…

4 years ago

MGR University BPT Fourth Year 746267 PAPER IV – P.T. IN ORTHOPAEDICS August 2018 Question Paper

746267 PAPER IV - P.T. IN ORTHOPAEDICSTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6267]…

4 years ago

MGR University BPT Fourth Year 746266 PAPER III – CLINICAL ORTHOPAEDICS August 2018 Question Paper

746266 PAPER III – CLINICAL ORTHOPAEDICSTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6266] AUGUST…

4 years ago

MGR University BPT Fourth Year 746265 PAPER II – P.T. IN NEUROLOGY August 2018 Question Paper

746265 PAPER II – P.T. IN NEUROLOGYTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6265]…

4 years ago