IV B.Tech I Semester Supplementary Examinations, February/March – 2018
CONSTRUCTION TECHNOLOGY AND MANAGEMENT (Civil Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART ?A (22 Marks)
1. a) What do you understand by critical path? [4]
b) What is project planning? [3]
c) Explain the event slack? [4]
d) Write about hoists. [3]
e) Write the purpose of impact crushers. [4]
f) Write about placing of concrete. [4]
PART ?B (3×16 = 48 Marks)
2. a) What are different elements present in PERT network and explain with an
example
[8]
b) Explain in detail Resources Smoothing method of Resources allocation problems. [8]
3. The network of a certain project is shown in Figure.1 with the estimated durations
of various activities. Determine the following: (i) Earliest event time and latest
event time (ii) Earliest and latest start and finish times of each activity. (iii) Total
and free floats for each activity. (iv) Critical path for the network.
[16]
4. Draw a typical cost ? duration curve and show on the optimum duration and
minimum project Cost.
[16]
Code No: RT41013
Set No. 1
R13
1 of 2
IV B.Tech I Semester Supplementary Examinations, February/March – 2018
CONSTRUCTION TECHNOLOGY AND MANAGEMENT (Civil Engineering)Time: 3 hours Max. Marks: 70
Question paper consists of Part-A and Part-B
Answer ALL sub questions from Part-A
Answer any THREE questions from Part-B
*****
PART ?A (22 Marks)
1. a) What do you understand by critical path? [4]
b) What is project planning? [3]
c) Explain the event slack? [4]
d) Write about hoists. [3]
e) Write the purpose of impact crushers. [4]
f) Write about placing of concrete. [4]
PART ?B (3×16 = 48 Marks)
2. a) What are different elements present in PERT network and explain with an
example
[8]
b) Explain in detail Resources Smoothing method of Resources allocation problems. [8]
3. The network of a certain project is shown in Figure.1 with the estimated durations
of various activities. Determine the following: (i) Earliest event time and latest
event time (ii) Earliest and latest start and finish times of each activity. (iii) Total
and free floats for each activity. (iv) Critical path for the network.
[16]
4. Draw a typical cost ? duration curve and show on the optimum duration and
minimum project Cost.
[16]
Code No: RT41013
Set No. 1
R13
1 of 2
5. a) Write short notes on: tractors, motors and graders. [8]
b) Write short notes on (i) Screening equipment (ii) Crushers (iii) Handling equipment
[8]
6. a) Briefly explain about batching and mixing equipment [8]
b) Write about mixing and placing of concrete. [8]
7. Write short notes on (a) Quality control and safety engineering (b) Form work (c) Fabrication and erection
[16]
Code No: RT41013
Set No. 1
R13
2 of 2
746268 PAPER V - REHABILITATION MEDICINE INCLUDING GERIATRIC MEDICINETHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY…
746268 PAPER V - REHABILITATION MEDICINE INCLUDING GERIATRIC MEDICINETHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY…
746267 PAPER IV - P.T. IN ORTHOPAEDICSTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6267]…
746267 PAPER IV - P.T. IN ORTHOPAEDICSTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6267]…
746266 PAPER III – CLINICAL ORTHOPAEDICSTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6266] AUGUST…
746265 PAPER II – P.T. IN NEUROLOGYTHE TAMIL NADU DR. M.G.R. MEDICAL UNIVERSITY [LN 6265]…